Barragens E Acudes
Mostrando 25-26 de 26 artigos, teses e dissertações.
-
25. Interações da usina hidreletrica de Americana com a população humana de Vila Bela (Americana-SP)
The Americana Hydroelectric power station (Atibaia River-Piracicaba Basin-SPBrazil) was built almost half a century ago; its main objective is to generate electric power. Such hydroelectric power station coexists with a human population in an area highly atfected by problems related to hydric resources degradation. This work has as its aim to establish the i
Publicado em: 1997
-
26. Qualidade como fator de melhoria da performace de auscultação e monitoramento de barragem
The usual models for dam monitoring were developed from informations taken from the observations made on the behaviour of the instruments ínstalled at those structures. The aim of those procedures are to check and confirm some hipothesis on dam safety, made according to the design criteria. The so called deterministic models may be considered as low perform
Publicado em: 1996