Emprego de planejamento fatorial no desenvolvimento de uma metodologia para extração de zinco de resíduos galvânicos

AUTOR(ES)
FONTE

Química Nova

DATA DE PUBLICAÇÃO

2007

RESUMO

The plating process generates solid waste rich in heavy metals and aiming to reduce environmental impact of such waste, this work suggests a methodology for zinc reduction, through a 2(4) factorial planning, studying the influence of the following variables: acid concentration (15, 20 or 30% v/v), acid type (sulfuric or hydrochloric), acid volume (15, 20 or 25 mL) and extraction time (12, 24 or 36 h). Through this methodology it is possible to establish the optimal conditions (15 mL of a 30% hydrochloric acid concentration during 12 h) to get a 100% efficiency in zinc extraction.

Documentos Relacionados