This paper addresses the problem of integrating in a single model operational optimization and cyclic scheduling of continuous plants. Considered are multiproduct, multistage plants with finite intermediate storage capacity (FIS). A combined optimization approach introduces synergic effects for more effective scheduling and plant operation (Alle and Pinto, 2001a,b). The representation proposed for this problem results in an MINLP model with a nonconvex feasible region and nonconvex objective function. In order to deal with nonconvexity, a spatial branch-and-bound global optimization algorithm is applied. Results show that the global approach is effectively able to yield more profitable solutions than those obtained by local optimization methods.
Documentos Relacionados
- SIMULTANEOUS SCHEDULING AND OPERATIONAL OPTIMIZATION OF MULTIPRODUCT, CYCLIC CONTINUOUS PLANTS
- A comparison of simulated annealing algorithms in the scheduling of multiproduct serial batch plants
- An milp formulation for the scheduling of multiproduct pipeline systems
- DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION
- Continuous electrochemical reactor improved by the addition of Moringa oleífera lam extract: optimization of operational conditions for Blue 5G dye removal